ADS-3MBXKC04-NXV17-FFFFFF

All-Over Print Men's Curved Hem Long Tank Top

S / White
$10.54
Sale price  $10.54 Regular price 
Skip to product information
ADS-3MBXKC04-NXV17-FFFFFF

All-Over Print Men's Curved Hem Long Tank Top

$10.54
Sale price  $10.54 Regular price 
Size
ColorWhite

Can team the bodybuilding stringer with various sweat pants, jogging pants, compression pants, Jersey pants and bermuda shorts, etc.

  • Fabric: Jersey(95% polyester and 5% spandex)
  • Regular fit
  • Sleeveless, curved hem, slightly longer back
  • Fabric weight: 180g/m²
  • Stitch Color: black or white, automatically matched based on patterns.
  • Average Lead Time: 2-4 business days(The first month delivery of new products is about 7 business days)
  • Care Instruction: machine wash cold with similar colors, do not bleach, tumble dry low, do not iron, do not dry clean.
  • This product is made on demand, with no minimum order quantity.
  • Multiple shipping methods available, and fees vary depending on the location and the shipping method selected.
  • For custom areas, please refer to the Yoycol mockup generator for details.
  • Notice: a variety of factors may cause slight differences between the actual product and the mock-up, including but not limited to colors and precision of elements position.

Size Guide

 

Inch S M L XL 2XL 3XL 4XL 5XL
Front Length 29.1  30.3  31.1  32.3  33.1  34.3  35.0  36.2 
Back Length 31.1  32.3  33.1  34.3  35.0  36.2  37.0  38.2 
Shoulder 11.4  11.8  12.2  12.6  13.0  13.4  13.8  14.2 
Bust 33.1  37.0  40.9  44.9  48.8  52.8  56.7  60.6 

 

Centimeter S M L XL 2XL 3XL 4XL 5XL
Front Length 74.0  77.0  79.0  82.0  84.0  87.0  89.0  92.0 
Back Length 79.0  82.0  84.0  87.0  89.0  92.0  94.0  97.0 
Shoulder 29.0  30.0  31.0  32.0  33.0  34.0  35.0  36.0 
Bust 84.0  94.0  104.0  114.0  124.0  134.0  144.0  154.0 

 

This size guide shows product measurements taken when products are laid flat. Actual product measurements may vary by up to 1".

You may also like